How to build seaweed mud? What precautions?

Seaweed mud construction method

1. Ensure that the base surface is flat, compact and clean, the water content is less than 10%, the PH value is less than 10, and the yin and yang angles and lines are straight and straight;

2. Add the water in proportion to the raw materials, and stir for a certain time on site to allow the mixture to fully dissolve and react completely;

3, carefully cover the parts that are not sprayed, check the base surface conditions to meet the specified requirements before construction, pay attention to ensure timely adjustment of construction speed, to ensure that the outer wall wet film thickness of 3mm, dry film 2mm; inner wall wet film thickness of 1.2mm, Dry film 0.9mm;

Seaweed mud construction program

1. First prepare fresh water according to the construction amount, add 90% of the construction water to the mixing vessel, then pour it into the dry powder of seaweed mud, soak it, stir it with electric mixer for about 20 minutes, stir and add another 10% of water, fully Stir well before use. The product after mixing with water is best used on the same day.

2. The seaweed mud is applied twice in two times. The first pass (about 1.5 mm thick) is about 50 minutes after completion (depending on the weather conditions of the site, the surface is not sticky, and the bottom is covered with material). Apply the second time (about 1.5 mm thick). After smearing, use a spatula to collect light, and then use a tool to make a pattern. The pattern is made for a long time, and some patterns need to be collected again after completion.

Seaweed mud construction environment

1. The relative humidity during construction must be less than 80%, and the moisture content of the base surface is less than 10%;

2, fabric construction temperature -5 ~ 40 ° C, avoid construction in direct sunlight in the summer;

3. It is not suitable to be constructed in an environment below 5 °C;

4. Outdoor construction is prohibited in bad weather such as rain, snow, hail, etc.;

Seaweed mud construction precautions

The substrate that is empty or cracked must be pre-treated, and the base is coated with the putty powder twice after cleaning.

During the construction process, avoid strong winds and direct sunlight, and it should be naturally dry.

This product is a water-soluble finish material and cannot be directly immersed in water.

The physical properties of natural raw materials, including the difference in color, are normal and do not affect product quality.

Seaweed mud should not be applied in the environment below 5 °C, do not eat, avoid entering the eyes.

Keep a safe storage distance with children and enhance protection when using.

Editor in charge: Zhang Kuanling

Ultem Clip On Sunglasses

Clip on sunglasses come in a variety of colors, shapes and sizes, with different levels of UV protection and special costs. This collection is our latest ultem clip on sunglasses collection, including Ultem Clip On Sunglasses, Clip On Polarized Sunglasses, Magnetic Clip On Sunglasses, Clip On Sunglasses, Clip On Sun Glasses

Ultem Clip On Sunglasses, Clip On Polarized Sunglasses,Magnetic Clip On Sunglasses,Clip On Sunglasses,Clip On Sun Glasses

Sense Optical , https://www.senseyewear.com